Construction Technology Platform

See it. Build it virtually.
Deliver it with certainty.

The only construction platform that connects 4D planning, immersive XR in the field, and live digital twin monitoring in one integrated workflow.

350%
Faster than traditional tools
500+
Projects delivered
38
Enterprise clients
1,170
Active platform users
The Problem

Construction projects don't fail on site - they fail in visibility.

Teams still rely on tools that leave too much room for interpretation:

  • Flat drawings that leave room for interpretation
  • Static schedules disconnected from site reality
  • Reactive problem-solving after work has already begun
  • No single source of truth across teams
The ToBe Suite

One platform. One workflow. Total visibility.

A shared spatial workflow connecting digital planning to physical execution:

01 PLAN

ToBe Builder

Simulate your project virtually before ground is broken. GIS + BIM + schedule + resources in one 4D environment.

02 SEE

ToBe XR

Experience the design at 1:1 scale on Meta Quest, iOS or Android. Virtual meetings with 12 concurrent users.

03 MONITOR

ToBe Twin

Stream real-time IoT data into your 4D model. Replace the Friday report with live operational insight.

Trusted by industry leaders

CPB ContractorsCIMICLeightonHochtiefTurnerUGLSpark North East LinkSedgmanThiessDragadosCPB ContractorsCIMICLeightonHochtiefTurnerUGLSpark North East LinkSedgmanThiessDragados

Three products. One integrated workflow.

Each product works standalone - and becomes exponentially more powerful together. Publish once from Builder and consume across every device in your ecosystem.

01 Plan

ToBe Builder

4D Construction Planning & Simulation

The core authoring system of the ToBe Suite. Bring together GIS site context, full-fidelity BIM, construction schedules and real-world resources into one unified 4D environment. Simulate and rehearse every aspect of delivery before a shovel hits the ground.

  • GIS, BIM, schedule and resources in one interactive view
  • Autodesk Construction Cloud & Trimble Connect import
  • Primavera P6, Asta and MS Project schedule sync
  • 466 animated 3D plant, people and materials library
  • Work zones, paths and logistics simulation across time
  • Publish to AR, VR and web with one click
Explore ToBe Builder
ToBe Builder  -  4D construction planning with GIS, BIM and schedule integration
ToBe XR Bundle  -  VR on Meta Quest, AR on iOS and Android from one publish
02 See

ToBe XR Bundle

AR, VR and Mixed Reality for construction

Publish once from ToBe Builder and consume across TobeXR (Meta Quest 3 VR/MR) and TobeMaps (iOS/Android AR). Review 4D sequences on site at true 1:1 scale. Collaborate in virtual meetings with up to 12 users from anywhere in the world.

  • TobeXR: VR and Mixed Reality on Meta Quest 3 / 3S
  • TobeMaps: AR overlay on iOS and Android at 1:1 scale
  • Virtual meetings with up to 12 concurrent users
  • 4D timeline playback in immersive environments
  • Underground utilities visualisation for strike prevention
  • Lift plan rehearsal and forensic animation
Explore ToBe XR
03 Monitor

ToBe Twin

Live IoT intelligence and digital twin

Stream real-time GPS, BLE and sensor data directly into your 4D project model. A 4-Layer Analytics Engine transforms raw telemetry into actionable fleet and workforce intelligence. Replace the retrospective Friday report with live operational insight.

  • 4-Layer Analytics: raw events portfolio-level insight
  • Load & haul cycle tracking (m³/hr, $/m³)
  • Device-agnostic IoT: Navman, Cartrack, Digital Matter & more
  • BLE workforce tracking, geofencing and safety alerts
  • Dual data collection: owned fleet IoT + hired truck mobile app
  • Web-based executive dashboard with exception highlighting
Explore ToBe Twin
ToBe Twin  -  real-time fleet tracking with GPS routes and device timelines
How it works

One publish. Every device.

Author your 4D model in ToBe Builder, then publish once to deliver across Meta Quest VR, iOS AR, Android AR and the web - a truly unified spatial workflow.

Publish from ToBe Builder to Meta Quest, iOS and Android
Proven on real projects

Trusted on Australia's largest infrastructure

From the Westgate Tunnel to Snowy 2.0, the ToBe Suite is deployed on some of the most complex construction projects in the Southern Hemisphere.

Westgate Tunnel Project  -  4D BIM visualization with construction schedule

Westgate Tunnel Project

CPB Contractors - Melbourne, Australia

Mining site  -  real-time equipment tracking with IoT integration

IoT Equipment Tracking

Mining & Resources - Device-agnostic fleet monitoring

ToBe Twin 4-Layer Analytics Engine  -  from raw events to executive intelligence
Intelligence Engine

From raw data to executive insight

The ToBe Twin 4-Layer Analytics Engine transforms raw IoT telemetry into actionable construction intelligence. From individual sensor events through to portfolio-level executive dashboards - every layer adds context and clarity.

Layer 1

Raw Events

GPS, BLE, accelerometer, sensor telemetry

Layer 2

Event Processing

Rules engine, deduplication, aggregation

Layer 3

Analytics

Cycle tracking, productivity, asset utilisation

Layer 4

Intelligence

Predictive analytics, forecasting, executive dashboards

Field Accessibility

AR on the device already in your pocket

TobeMaps brings augmented reality to iOS and Android - no specialised hardware required. View your BIM at 1:1 scale superimposed on the real construction site. Navigate 4D sequences, simulate excavation volumes, and walk through your project before it exists.

📱

TobeMaps iOS

iPhone & iPad AR at 1:1 scale

🤖

TobeMaps Android

Full AR experience on Android

🥽

TobeXR

Meta Quest 3 VR & Mixed Reality

👥

Virtual Meetings

12 concurrent users, anywhere

TobeMaps AR on iOS and Android  -  view BIM at 1:1 scale on site

Trusted by construction leaders

What our enterprise clients say about the ToBe Suite

ToBe not only verified the program but saved us real costs by helping our subcontractors understand the erection sequence and optimising the pre-assembly. The ability to load the accelerated program for immediate re-validation is powerful. Workpack videos can be produced showing the exact location of EWPs and personnel.

Pat Rafferty

Project Manager, Westgate Tunnel Project

CPB Contractors

Utilizing ToBe software has significantly enhanced our workflow efficiency and user experience. The workings with GIS Map and point cloud data are exceptional and the added feature of loading and reloading project files has never been easier. The convenience of the program's exportability to Excel further streamlines the process.

Francesco Tizzani

Group Manager - Information Systems and Digital

Leighton Asia

The highly congested Airport forecourt requires detailed realistic visualisations to assure the client of public impacts and safety. We were able to demonstrate the cranes and lifting could occur entirely within the barricaded areas. This software is a key differentiator for CPB.

Project Engineer

Melbourne Airport Forecourt

CPB Contractors

Ready to see your next project in 4D?

Start with ToBe Builder PRO - 14 days free, no credit card required. Full access from day one.